My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-02_PERMIT FILE - M2002004 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002004
>
2002-05-02_PERMIT FILE - M2002004 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:38 PM
Creation date
10/15/2010 10:34:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
PERMIT FILE
Doc Date
5/2/2002
Doc Name
Comments
From
Pueblo County Residents
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(6) <br /> <br />RECEIVED <br />MAY un 2 .`022 <br />April 20, 2002 <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80202 <br />Division of Minerals and Geology <br />Dear Division, <br />As a resident of Pueblo County, the area where the Rio Grande Portland Cement plant is <br />proposed, I am concerned about the quality of its Reclamation Plan. The permit application is complex and <br />requires much study. Please extend the public comment period for an additional 70 days and schedule a <br />public hearing on the permit. It is imperative that this hearing be held in Pueblo, in the evening, so that the <br />public may attend. <br />The areas that need to be addressed at the public hearing are the inadequacy of the plan to <br />restore the area to use as rangeland based on the amounts of water and seed specified, in relation to the <br />climatic conditions of the area; <br />-the monitoring requirements for reclaimed areas are unspecific and insufficient, and do not <br />adequately protect the public from continued blowing dust - which will occur indefinitely, <br />according to the plan; <br />-time limits described are not specific, and terms such as "completion" are inadequately defined; <br />-the plan is vague throughout - it basically fails to outline in detail a specific plan <br />-information on mineral rights is missing; <br />-there is no evidence of how the hydrologic balance of the affected land and the surrounding area <br />will be preserved; <br />-no real historical or archaeological survey has been done to determine whether important cultural <br />areas will be destroyed by mining <br />-there is no evidence of how piles of removed soil will be prevented from blowing. <br />I have many other concerns. Muchmore opportunity for study and public comment, major <br />revision, and a chance to get answers to questions, is necessary before this Reclamation Plan can <br />be considered worthy of use on our beautiful landscape in Pueblo County. <br />Please send me a notice of the public hearing when it is scheduled. Thank you. <br />Sincerely, <br />14 L_ &Ik? <br />& 30N f 3
The URL can be used to link to this page
Your browser does not support the video tag.