My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-14_REPORT - M2005069
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2005069
>
2010-10-14_REPORT - M2005069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:29:27 AM
Creation date
10/15/2010 7:35:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005069
IBM Index Class Name
REPORT
Doc Date
10/14/2010
Doc Name
Annual Fee/Report/Map
From
encana
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL RECLAMATION REPORT FOR 200912010 <br />1.0 BACKGROUND <br />On March 15, 2006, the State of Colorado Division of Minerals and Geology approved the <br />Encana Oil & Gas (USA) Inc. (Encana) 112c Mining Permit application for the West Fork Pit <br />(Permit No. M-2205-069). The West Fork Pit is located in portions of Lot 4 and the S1/2,W1/2 <br />and NW1/4 of Section 3, Township 5 South, Range 96 West, 6th P.M. and in the road corridor in <br />Lot 4 with an Avenue width of 130 feet in Section 34, Township 4 South, Range 96 West, 6th <br />P.M. <br />2.0 CONSTRUCTION SUMMARY <br />The following summary is the 2009/2010 annual summary report of the West Fork Pit. In 2009 <br />and 2010, Encana did not remove any materials from the West Fork Pit. There was no expansion <br />of the pit and no changes occurred to the project map that was initially approved with the permit. <br />During initial construction of the West Fork Pit in 2006, Encana's contractor disturbed <br />approximately 4.0 acres of the previously approved 18.4 acres. The topsoil was bladed to a <br />depth of three to six inches across the 4-acre area and segregated along the east, south and <br />western sides of the pit to create a stormwater containment pit. Excess material not removed <br />from the pit during the 2008/2009 activities was then leveled out across the pit. The pit floor is <br />sloping to the south at approximately 3 to 4%. The walls of the pit are approximately 2v:1 h. <br />The quarry pit has been excavated approximately 10 feet deep. <br />3.0 EROSION CONTROL <br />Encana's contractor constructed a soil berm around the outside perimeter of pit during the topsoil <br />grading activities when the pit was first constructed. The topsoil stock pile was located adjacent <br />to a perimeter soil berm constructed for secondary containment for potential- storm water runoff. <br />No additional temporary or permanent erosion measures are currently necessary at the site. <br />4.0 RECLAMATION <br />The topsoil pile was reseeded with the Encana North Parachute Ranch Upper Elevation seed <br />mix, which includes the following seed mixture. <br />Recommended Seed Mix for Upper Zone.Disturhanee. <br />Species Variety cultivar Seeding Rate PLS*/Acre <br />Grasses <br />Slender Wheatgrass San- Luis 3.0 lbs. <br />Mountain Brome Garnet 2.0 lbs. <br />Nodding Brome 2.0 lbs. <br />Idaho Fescue or Letterman's Needlegrass 1.0 lbs.
The URL can be used to link to this page
Your browser does not support the video tag.