Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
9/2/2010
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development will add approximately 2,430 acres; and Interim Phase III development will add approximately 20 <br />acres to the affected area. Areas to be developed in the WMD during the current and subsequent permit terms are <br />shown on Map 23 Mine Plan. Alignment of development entries may be adjusted, as necessary, to address geologic <br />conditions. The preliminary development layout will include main and sub -main development work as described in <br />the referenced Permit Revisions. The dimension of pillars in these development areas may vary based upon mining <br />conditions. Sumps and ventilation doglegs will be added as needed. Locations for these minor operational features <br />are not provided on Map 23, due to the need for some flexibility in the placement of these features. <br />During the Phase I, II, and Interim III WMD development, preliminary development work will be conducted under <br />the Fish Creek AVF, Fish Creek, several powerlines, and several stock ponds. A more detailed discussion of <br />undermining these structures is presented under the subsidence discussion. Because the preliminary development <br />work (WMD, Panels 13- through 17 -Left)) will be limited to main and sub -main entry development with retention <br />of support pillars, no subsidence will be associated with these activities. <br />Underground Drillholes (MR01 -172 — Withdrawn 07/11/01) <br />(3) Mine Facilities <br />(a) A narrative and maps to meet the standards prescribed in 2.10 describing the location, <br />construction modification use maintenance and removal of mine facilities in the permit area including all <br />buildings, structures and utility corridors. <br />RESPONSE <br />The existing Foidel Creek Mine surface facilities consist of building structures, material handling system, utilities, <br />and surface areas as shown on Map 24, Surface Facilities. Previously disturbed areas within the surface facilities <br />area may be leveled and then utilized for additional storage. <br />Buildings <br />The original mine administrative office, a 60 x 36 foot modular trailer structure, was modified to allow for the cold <br />weather and heavy snow -load of the area. That administrative structure contained eleven offices for the mine staff. <br />A second administrative office was subsequently added for mine staff. The 36 x 56 foot trailer was located west of <br />the original administrative office. The trailer contained a bathroom and was hooked up to the existing septic and <br />water systems. Electrical power was supplied to the trailer by a transformer located on the east side of the trailer. <br />The location is shown. on Map 24, Surface Facilities <br />As the mine expanded, a new office/bathhouse complex was built to replace the modular trailers, as indicated on <br />Map 24, Surface Facilities. The office/bathhouse building is of concrete block construction and has dimensions of <br />approximately 200 x 75 feet. Approximate height of the building is 15 feet. The building was placed on a <br />reinforced spread- footer foundation and has a reinforced concrete slab floor. The bathhouse /office facility replaced <br />the former bathhouse trailers, and was constructed adjacent to the operations center as indicated on Map 24 <br />In order to evaluate the existing septic system and leach field for future expansion at the mine a percolation test was <br />conducted. Approximately six, 4 -inch diameter holes, 30 -48 inches deep were augured for the percolation test. <br />After the test was completed, the cuttings were placed back in the hole. Also, an eight -foot deep backhoe pit was <br />dug so a soil profile could be obtained. After the backhoe pit was logged, it was backfilled. It should be noted that <br />the activity as shown on Map 24, Surface Facilities, would be within the boundary of the existing sediment control <br />system. The existing water and sewer systems were found to be adequate and were utilized for the new facility. <br />The former trailers were removed during the summer of 1993, with a portion of the resulting open area becoming <br />part of the parking lot. Approximately 3,000 cubic yards of material was removed during excavation for the <br />foundations and slab, and approximately 400 yards of compacted backfill material was used for the foundations and <br />slab. In addition, some 850 tons of gravel was compacted beneath the foundations and slab. No other excavation work <br />is planned. A limited amount of additional dirt-work included contouring of the parking lot area where the current <br />administration trailer and parking is located, and a possible widening of the access road by some 25 feet, should this <br />TR10 -75 2.05 -17.1 08/19/10 <br />