0 i <br />• d. Leach Field Installation: <br />In order to contain both nuisance spills and large fuel tanker spills within the leach field, a geomembrane <br />type HDPE plastic liner is to be installed approximately five feet below grade. The liner should be installed <br />sloping towards the drain line in the center of the leach field. The liner is then to be covered with one inch <br />of sand and the field area backfilled with 3 inch minus crushed stone. Because it may be necessary, as part <br />of regular maintenance, to excavate the leach material, yellow caution tape should be placed on top of the <br />sand layer to indicate the proximity of the liner. <br />e. Oil -Water Separator: <br />The oil -water separator, to be provided by Twentymile, will be capable of handling a spill of up to 4,000 <br />gallons of petrochemicals. It is to be installed by the contractor in the sump area as noted in Drawing <br />#070810D. The inlet of the separator will be connected to the leach field drain line and filled with water. <br />If fuel is spilled, it will flow through the leach field and down the drain to the separator where the fuel will <br />displace water. Fuel will be retained in the separator by a series of baffles and overflow water will flow <br />into the sump. <br />f. Grading: <br />After the leach field, drain line and separator have been installed the area surrounding the installation is to <br />be re- graded and sloped to restore proper drainage to the area. <br />TCC Responsibilities <br />1. Obtain all required state and county environmental permits and approvals. <br />2. Provide on site hazard training necessary for contract personnel to operate on the surface areas. <br />• <br />Contractor's Responsibilities <br />1. Provide all materials, equipment, tools, services, insurance, engineering design, labor, and supervision for the <br />turnkey design and construction for this project as required by these specifications and parameters. <br />Contractor shall furnish a list of equipment available and anticipated to be used on the project. <br />Contractor shall furnish a list of supervisory, technical and management personnel to be associated with the <br />project. <br />2. All contractor personnel on the site shall have completed TCC's on -site hazard training prior to commencement <br />of any portion of the project. <br />3. Contractor shall be responsible for the safety on and around the construction site. Contractor shall be solely <br />responsible to effectively secure the construction site to restrict and prohibit access to the immediate <br />construction area for the safety of all persons that may enter the construction area. Contractor shall post signs <br />around the construction site giving warning of any and all dangers that may potentially exist. <br />4. Contractor shall comply with all applicable federal, state and local laws, regulations, codes, and ordinances. <br />Refer to the general Peabody Safety guidelines below. <br />5. Contractor shall provide MSDS information for all products brought onto the job site. <br />6. Oils and lubricants may not be disposed of on the site pad and must be handled properly for disposal. <br />r � <br />SLC- 5537792 -7 12 <br />