Peabody Energy <br />• Exhibit A <br />Schedule of Work <br />Twentymile Coal Company (TCC) will be upgrading the on site fueling stations at the mine property to properly <br />comply with the new SPCC rules in §112.7(h) of the Code of Federal Regulations Chapter 40 that come into effect <br />November 10, 2010. These new rules require the installation of secondary containment systems at four fueling sites <br />on the Twentymile property. <br />Bidders are requested to prepare a turn -key, lump sum proposal for the work generally described in this scope of <br />work. A site visit is required prior to bidding. The proposal shall include: <br />1. A detailed description of all work the Contractor is intending to perform. <br />2. A schedule detailing Contractor's plan to complete the project within TCC's project timing. <br />3. An itemized bid including all major categories of the proposal. <br />Drawings of the general site plans and pad designs are included with this scope of work. <br />Primary Site Contact Secondary Site Contact <br />Eileen Sullivan Mike Berdine <br />970 - 875 -2147 Work 970- 870 -2782 Work <br />970 - 846 -9686 Cell <br />esul l ivan2 @ peabodyenergy.com mberdine @peabodyenergy.com <br />Location (Refer to Figure 1 - Location Map): <br />• The TCC mine site is located approximately 9 miles north of Oak Creek, Colorado, on Routt County Road #27. The <br />work sites are located on the main mine site around the shop, washplant and tipple areas. Please see the attached <br />map for reference. <br />Proiect Timing <br />The projected dates and timing for the project follow: <br />1. Submit Responsibilities, specifications and scope of work to contractors - 7/23/2010 <br />2. Bids due at to Peabody Purchasing Group 8/6/2010 <br />3. Award contract 8/13/2010 <br />4. Commence Work Week of 8/16/2010 <br />5. Complete Work at all sites Week of 9/20/2010 <br />TCC reserves the right to inspection of all work in accordance with the following specifications and scope of work <br />provided herein this document. All scope of work questions shall be directed to Eileen Sullivan at the contact <br />information provided above. <br />A detailed construction schedule shall be submitted with the contractor's proposal that accurately defines the <br />contractor's plan of construction and the required timing to complete the project. The contractor shall identify any <br />potential problems that may interfere with the contractor's ability to mobilize immediately after receiving the notice <br />• from Twentymile that the site is ready for construction. <br />Detailed Scope of Work: <br />SLC- 5537792 -7 <br />