My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_PERMIT FILE - C1982056A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2010-06-04_PERMIT FILE - C1982056A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:47 PM
Creation date
10/14/2010 10:11:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/4/2010
Doc Name
Pages 2.05-123 to 2.05-197.3
Section_Exhibit Name
2.05.5 Postmining Land Uses
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raw data compiled from the leach study are in the form of spoil and leach solution quantities, EC, and <br />cumulative leachate weight measurements for each incremental stage of the leaching process. Each of the 218 <br />• incremental stages was measured for EC correlation of the incremental EC with TDS values of the leachate <br />samples, results in a TDS /EC ratio of 0.73. Using this ratio, multiplication of incremental EC values by 0.73 <br />will give an estimated TDS value. Initial concentrations of leachate are in the order of 4000 mg/l, which is very <br />similar to observed concentrations of actual spoil, discharges at the adjacent Eckman Park Mine. Water <br />chemistry characteristics of leachate and spoil discharge are also very similar. This indicates that the leaching <br />tests yield a reasonably good prediction of initial water quality that might be expected to occur in the caved <br />overburden material after flooding of the mine workings. The approximately 50 percent higher TDS values <br />observed in some areas of the mine indicate that the flushing times calculated from these tests may have to be <br />increased by as much as 50 percent. <br />The primary purpose of the leaching study was to determine the time interval required for the solute <br />concentration of the leachate to return to the baseline level. The leaching study indicated that significant <br />decreases in EC levels occur when the ratio of the volume of leachate to the weight of overburden material is <br />about 0.9 1 /kg (Exhibit 38, Figure 3). Using a bulk density of 1.45, this is equivalent to leaching of <br />approximately 0.6 and 1.0 (r) pore volumes of the overburden material. Based on the results of the leach study, <br />when the volume of water which has percolated through the caved overburden material is equivalent to about <br />1.5 1/kg of overburden material, the ground water TDS value will be at the baseline level, and no additional salt <br />concentrations will occur above baseline at that point. <br />The leaching ratios to reduce TDS levels to a given value can be converted to time by applying factors for a rate <br />of water movement through the caved overburden, and assuming values for the pore volume of the caved areas. <br />This is determined from the equation: <br />t = rV <br />R <br />where: <br />t = time in years to reduce TDS to required level <br />r = water volume /caved material pore volume ratio to reduce TDS to required level (from leach test <br />results) <br />V = Pore Volume of caved material in acre -feet <br />R = Rate of movement of ground water through caved material in acre -feet per year <br />Recharge to the caved material from the undisturbed overburden unit was not included in the calculation since it <br />amounts to a negligible portion of the total. <br />The pore volume of the caved material, which is likely to exist after mining, is estimated to be about 186,000 <br />acre -ft (V). This number is derived in Dewatering and Potentiometric Drawdown in Bedrock Units This is <br />based on a 24 square mile mining area, a thickness for the caved zone of about 100 feet and an effective porosity <br />of 10 percent. After re- establishment of potentiometric levels, the recharge rate to the Wadge overburden <br />should be similar to pre- mining conditions, which has been estimated at 12.3 acre -ft per year (R). <br />These values were assigned for this calculation. Solving for "t" in the above equation for leaching of 0.6 and <br />1.0 pore volumes, results in time factors of 9,100 and 15,000 years, respectively. When taking into account the <br />higher TDS values measured in the mine workings, this calculation indicates that if ground water flow rates <br />through the caved material are about 12.3 acre -ft per year, it will take at least 14,000 years of ground water TDS <br />levels to start declining significantly and 23,000 years to return to baseline levels. <br />As potentiometric levels in the Wadge overburden recover to premining conditions, lateral ground water flows <br />in the unit from recharge areas in the southern and western margins of the Twentymile Park Basin to the major <br />discharge area along the northeast margin of the basin will also tend to be re- established. This will result in <br />movement of lower quality ground water from areas directly overlying mined zones into the undisturbed <br />overburden units to the east of the proposed mine area. <br />PR09 -08 2.05 -144 04/27/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.