My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_PERMIT FILE - C1982056A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2010-06-04_PERMIT FILE - C1982056A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:47 PM
Creation date
10/14/2010 10:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/4/2010
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Retaining Wall <br />TCC installed a Hilfiger -type retaining wall at its' Batch Loadout Facility (BLO). The location is shown on Map <br />24. The retaining wall function to stabilize the slope at this location to limit any erosion between the access to the <br />BLO and the railroad tracks. The wire basket and rock retaining wall will be buried as part of final reclamation. <br />Geotechnical Investigation - Batch Weigh System (MR95 -114) <br />TCC will conduct a geotechnical investigation of the proposed construction site for a Batch Weigh train loading <br />system and associated facilities. Detailed designs and a technical revision application for construction of the batch <br />weigh system will be submitted separately from the minor revision application addressing the geotechnical <br />investigation work for the project. The geotechnical investigation for these facilities will entail drilling fourteen <br />shallow holes. The proposed drilling site locations are shown on Figure 20 in Volume 4 of Permit C -82 -056. <br />Drilling will be conducted with a self - leveling track - mounted portable drilling rig (CME 45 mounted on <br />Bombardier Snow Cat). Four -inch diameter continuous flight power augers will be utilized. Dril(holes will be <br />driven to bedrock with core samples obtained as necessary to evaluate construction requirements for the proposed <br />facilities. Bedrock is known to occur at depths ranging from 20 -60 feet in the vicinity of this project. No drilling <br />fluids will be utilized in association with the rig and no structures or preliminary site preparation work will be <br />necessary to support the drilling effort. <br />Thirteen proposed drill -sites are located on previously disturbed areas and one site is located in an area of <br />undisturbed native topsoil. Drilling is estimated to take approximately three 3 -6 hours per hole, depending upon the <br />depth to bedrock. No topsoil salvaging operations are proposed in association with the drilling program, as drilling <br />will likely occur under frozen ground conditions during the month of February 1995 and no significant adverse <br />impacts to the topsoil resource are anticipated. All drill -sites are located in areas to be further disturbed during <br />construction of the Batch -Weigh system facilities. Topsoil will be salvaged, as appropriate, during the initial <br />construction phase of the Batch -Weigh system. <br />The track - mounted equipment utilized for the geotechnical investigation will produce minimal disturbance in <br />traveling over frozen ground and drilling for short durations. Particular care will be taken to access the site with <br />undisturbed native soils during a period when frozen ground conditions are prevalent. To the extent possible, <br />cuttings generated during the drilling process will be returned to the drillholes prior to abandonment to minimize <br />potential sediment transport from each site. In the event an aquifer is intercepted during drilling at any site, the <br />affected drillhole will be sealed using a grout plug in the aquifer zone and then will be backfilled to the surface with <br />cuttings. In the event formation water is encountered during drilling and liberated on the surface, silt fences will be <br />erected as secondary sediment control measures to minimize the transport of sediment off site. <br />Construction of the Batch -Weigh system and associated facilities is anticipated to commence during March 1995. <br />In the event construction initiates on schedule, permanent sediment control measures and topsoil salvage <br />U] <br />TR07 -59 2.05 -48 02/27/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.