My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_PERMIT FILE - C1982056A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2010-06-04_PERMIT FILE - C1982056A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:47 PM
Creation date
10/14/2010 10:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/4/2010
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional conveyor was also installed to handle the waste rock generated by the mining process. A metal slop, <br />belt -drive building with dimensions of 32 x 40 x 20 feet, located north of the existing transfer building, was <br />constructedrn 1995, and provides electrical and mechanical support for conveyor system. Bonding calculations <br />addressing removal of the new slope belt -drive building are, presented in Volume 1 -A. <br />TCC's upgraded coal handling facilities provide the mine with the flexibility to convey coal at varying rates <br />depending on demand. Uniform construction practices utilized in the facility upgrades include drivingflnstalling <br />caissons and building grade beanis and footers to provide an adequate foundation for new or modified structures. <br />The individual design requirements for the various structures dictate the type of foundation required. The facilities <br />are shown on Map 24, During the upgrade, the width of the slope conveyor belt was increased to accommodate the <br />higher tonnage. All belts and systems are sized to efficiently convey the increased tonnage. Tne existing transfer <br />building is used to support the stepe -bolt, <br />The new transfer building is located south of the existing transfer building. In this building, coal is transferred from <br />the slope -belt to the stacker tube feed -belt, or waste rook is transferred from the slope -belt to the waste reek <br />conveyor belt. The loeation of the belt has born modified to facilitate operations around the storage building. The <br />new location, as shown on Map 24, Surface Facilities, required excavating approximately 11,000 CY of span and <br />rerouting Ditch D-4 around the stockpile. The excavated material was either placed in the reclaim tunnel <br />excavation or in the waste rock disposal area. The excavated spoil was sloped to I% IV or staeper depending on <br />field conditions. If field conditions require, a safety bench will be constricted in the cut slope. Removal of this <br />material will not impact the reclamation plan. <br />During construction of the coal stockpile pad and haulroad, a minor amount of cut and fill Work was required, The <br />northwestern edge of the pad and the haulroad required approximately 20,GM CY of fill. Approximately 6,000 CY <br />of fill was required for the remainder of the area to get the pad to grade. During site preparation, some of the <br />existing fill was removed from this area. Estimates indicate approximately 15,WO CY of material was removed, <br />relative to the existing configuration at the time. Of this volume, approximately 12,000 CY was not suitable for <br />construction proposes and was placed in the waste rock disposal site. Required fill material was borrowed from the <br />spoil adjacent to the TCC portal area. The borrow area is shown on Map 24. The burrow area was graded level, <br />and thus will provide additional storage area. The sideslopes of the borrow area were regraded to M: IV, <br />Construction of the reclaim tunnel and laterals required excavating trenches and then constructing the tunnel within <br />the trenches. The tunnel and laterals are constructed of concrete andtor steel. An exhausdescape tunnel extends <br />from the reclaim tunnel. The excavated dirt was used in constructing the stockpile base. A concrete wail was <br />constructed when the overland belt exits the reclaim tunnel. ?tppro'.cimatety 100 CY of material was removed from <br />the borrow area and used as bedding and packing for Culverts D -2 -C: and D -F, <br />Coal transferred from the stacker tube feed -belt to the stacker tube is stockpiled around the stacker tube. As shown <br />on Map 24, a portion of existing Haulmad B (see CYCC Permit C- $T.p ?T }, was covered up by the coal stockpile <br />and reclaim tunnel. This required that the haulroad be touted around the north and west sides of the coal stockpile. <br />The haulroad proVe and typical cross - section are provided on Map 30A. 'Ile stockpiled coal sits over the reclaim <br />tunnel and is typically fed by gravity to the overland belt by vibratory feeders. As the stockpile increases in size, <br />however, the coal is dozed into the live coat area of the stockpile to facilitate gravity feed to the feeders, Fecders <br />located in the reclaim tunnel feed coal onto the overland belt from the raw coal stockpile. <br />A control building (MCC -1) is constructed adjacent to the reclaim tunnel exhaust fau. This building houses the <br />instrumentation necessary for the reclaim system. The building is approximately 9 x 10 x 10 feet and is constructed <br />on a 6 -inch concrete pad and 4 x 10 foot stem wall. The location of the building is shown on Map 24, When the <br />building is no longer required, it will be removed. <br />Overland Convenor (Mndifrad and S n rc,,e�led by TRn7 for Wg':hplant 11} <br />The 49 -inch overland belt was constructed during 1999 to convey coal from the reclaim tunnel at the ROM Coal <br />Stockpile to the Crusher Building at Tipple 2. Alternatively, if trucks are used for coat haulage, the coal can be <br />2.05 -27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.