Laserfiche WebLink
The Wadge Seam will be mined out and production will gradually decline during the' last few years. The estimated <br />remaining mine life, based on maximum annual peak production of 12,000,000 tons, is approximately 8 years. The <br />• actual mine life is subject to extension or reduction in case of'either yery.weak or strong coal markets, resulting in <br />reduced or increased yearly production, and identification of any additional economically recoverable reserves. <br />Productivity estimates were based on expected mining conditions and analysis of productivities at other western <br />U.S. mines. It is expected that gradient and water inflows will significantly reduce down -dip development <br />productivities. It is assumed that four to six continuous miners and a high- capacity longwall will be required to <br />reach maximum yearly production, Continuous miner productivities would vary from 200,000 to 325,000 tons per <br />year per unit, depending onlocation. Longwall productivity is expected to be approximately 6,000,000- 11,000,000 <br />tons per year, dependent on mining conditions. <br />Labor Force <br />The Foidel Creek Mine Labor force schedule is shown in Table 47, Labor Force Schedule. The total employee <br />numbers increase from an estimated 47 in 1983, for a one - section mine, to approximately 500, at full production. <br />The current workforce is- approximately 480 people (2006). <br />Mining Eauioment <br />The Foidel Creek Mine will use standard mining methods and equipment commonly used in the western U.S. coal <br />industry. <br />A longwall section will contain the following representative list of equipment: <br />155 Shield Roof Supports <br />• Armored Face Conveyor <br />Shearer <br />Stage- Loader <br />Electrics <br />Hydraulic System <br />Miscellaneous Pumps and Tools <br />A typical continuous miner section will contain the following equipment: <br />Continuous Miner <br />Shuttle Cars <br />Roof Bolter <br />Feeder- Breaker <br />Electrical Load Center <br />Mantrip Vehicle(s) <br />LHD Scoop <br />Parts Car <br />Continuous Haulage System <br />Rock Duster <br />Miscellaneous Pumps and Tools <br />The following types of utility and support equipment will be utilized in the Foidel Creek Mine (both underground <br />and surface): <br />k , 21 �P•P.1 Ill lJ:. 0_ v. <br />• Electrical Distribution System <br />Production Water Supply System <br />Conveyor Systems <br />PR06 -07 2.05 -10 11/07/06 <br />