My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-04_PERMIT FILE - C1982056A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2010-06-04_PERMIT FILE - C1982056A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:12:47 PM
Creation date
10/14/2010 10:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/4/2010
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N Right and 7 Right Cross -Panel Entries Grout Backfill <br />In order to mine through the 8 Right and 7 Right cross -panel entries. TCC plans to backfill with a cement -flyash <br />grout. This operation will require topsoil salvage, construction of a pad for drilling and grouting operations, a <br />borehole into the 7 Right main entry, a stockpile area for flyash, and the concrete contractor's equipment. The site <br />will be used for operations associated with the backfill the 8 Right cross -panel entry, then all equipment will be <br />removed from the site for approximately one year. Equipment will be re- mobilized to the site approximately three <br />months prior to the longwall crossing of the 7 Right cross -panel entry and this entry will be backfilled. The pad <br />area will be reclaimed after the 7 Right cross -panel entry is backfilled. <br />Site preparation will require the stripping of approximately 20 inches of Clayburn loam topsoil and placing it in a <br />stockpile within the site. The footprint of the topsoil stockpile will be approximately 160 feet by 85 feet in a <br />crescent shape on rile east side of the site. A berm will be placed around the stockpile and topsoil signs will be <br />placed on the stockpile to maintain separation from the pad area. The stockpile will be temporarily seeded with an <br />appropriate seed mixture to prevent loss of (tie resource. <br />The proposed pad site will cover an area of approximately 2.5 acres on the north side of Routt County Road 33 in <br />the SW 114 of the SE 114 of S 21, T 5 N, R 86 W. The pad will be used for drilling activities and grout pumping <br />operations. Gravel will be placed in areas that will receive vehicular traffic in order to prevent excessive rutting of <br />the site. Approximately 820' of four strand, barbed wire fence will be constructed around the perimeter of the site. <br />Access to the site will be from either County Road 33 or the existing ranch road. Up to four temporary culverts <br />will be used at these access points to direct off -site drainage along the county road and ranch road. The culvert <br />with the largest drainage area was designed based on the 1 year, 6 hour stop» event for a minimum 6 -inch <br />diameter. On -site drainage will be directed to a perimeter berm and ditch then off-site through rock filters and <br />across vegetative filtering to Foidel Creek. <br />Mud pits will be required for the cuttings from the drilling operations and washdown of the concrete hatching plant <br />area. Three 20' x 20' x 6' deep pits are planned with a 2' high safety berm around the perimeter. Approximately <br />200 cubic yards of material from this excavation will be stockpiled immediately adjacent to the pits with the <br />remainder of excavated material being used for the construction of the safety bents. Up to 3S cubic yards of <br />cuttings will be placed in the mud pits. Excess capacity is provided to collect drainage from wasltdown, storage of <br />water, and emergency grout storage for the concrete hatching operation. The pits will remain until the site is <br />regraded for reelmnation. <br />Two concrete pads are proposed to be poured at the site. A concrete pad will be built for the mobile concrete batch <br />plant and pumping station that will be approximately 130 feet by 70 feet and 6 inches thick. A concrete pad with <br />approximate dimensions of 80 feet by 40 feet by 6 inches thick is planned for the area where the trucks will off- <br />loading flvash to prevent contamination of this material with mud or gravel. <br />A borehole will be drilled into the 7 Right main entries for pumping of tine grout into the cross -panel entries. <br />Cover above the coal seam in this area is approximately 1,200 feet. The finished hole will be fully grouted to 6 ''/2- <br />inch inside diameter steel pipe. Communications and the grout feed line will be installed to the underground <br />workings through this borehole. When the operation is complete, the hole will be plugged to the surface with <br />grout and the casing cut off a minimum of 3 feet below grade. <br />Flyash will be delivered to the site via belly -dump andfor end -dur p trucks from either the Hayden or Craig power <br />10 plant. Up to 20,000 cubic yards of flyash will be used for each of the backfill operations. The storage pile <br />dimensions will be approximately 140 feet by 80 feet. The flyash stockpile wilt be sprayed with water to reduce <br />airborne emissions. <br />h4R 97.154 2.05 -62 Revised 919197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.