Laserfiche WebLink
October 11, 2010 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter of 2010 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 Removal of All Organic Material and Topsoil <br />2.2 Placement of Underdrainage Systems <br />2.3 Installation of Surface Drainage Systems <br />2.4 Placement and Compaction of Fill Materials <br />2.5 Revegetation <br />3.0 References <br />Appendix A - Drawings <br />I certify that this report was prepared by me. <br />Seth Austin Puls <br />CO PE 41406 <br />Engineering Coordinator <br />Trapper Mining, Inc. <br />?,p0 tIC?N <br />ci??,,??PUSTIN,oGI %O <br />s <br />41406 <br />Ate; 10 -It-i' <br />o??sS/ONAL ?NG?? <br />PROFESSIONAL SEAL <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />3 <br />4 <br />5 <br />1