Laserfiche WebLink
r <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />September 2010 Monthly Report <br />Page 3 <br />Table 2 -September 2010 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />(feet) Total Depth (ft) Volume of <br />Water (ft) <br />P12 9/30/10 Dry 41.71 0.02 <br />P13 9/30/10 41.23 41.34 0.11 <br />P14 9/30/10 D 41.24 0.00 <br />P15 9/30/10 Dry 41.10 0.00 <br />Table 3 below provides the calendar year 2010 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />February 2010 117 tons Transferred sludge from drying pad to <br /> tailings impoundment. <br />June 2010 115 tons Transferred sludge from Pond #3 to drying <br /> ad. <br />August 2010 115 tons Transferred sludge from drying pad to <br /> tailings impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0798 or Mr. Bill le 03) 324-2630. <br />in erely, <br />J lio F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File