Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS Task # : 07a State :Colorado Permit/job #:M-1982-036 <br />- <br />Date : 1010812010 County :Routt Abbreviation :none <br />User : DMC Site :Mesa Gravel Pit Filename :M036-07a <br />Permit or other job action :So - -- <br />Task description :Mobilize/Demobilize reclamation crew/equipment <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />unu DAArIADI C Cl1111D11ACKIT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 627G 40.90 $58.15 $117.55 1 $175.70 $117.55 - $0.00- <br />-Cat D9R - 9U (2005) 67.38 $58.16 $125.45 1 $183.61 $125.45 $0.00- <br />-Reveg. Tractor 15.00 $15.00 $88.67 1 $103.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $462.97 $331.67 $0.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total UnitCost/hour: $88.67 $117.55 $125.45