Laserfiche WebLink
Mr. Allen Sorenson - DRMS <br />March 22, 2010 <br />Page 2 <br />requirement. CIVIC will continue to collect data to fulfill this requirement and assure that proper capacity is <br />maintained in the tailing facility to completely contain the design storm events. <br />Upon review and approval, CIVIC requests that DRMS send written approval of the upgraded facility as- <br />builts as referenced in Rule 7.3 and also send acknowledgement that TR-14 Stipulation No. 1 has been <br />fulfilled. <br />Please contact me at (303) 569-3221, ext. 1204 or Miguel Hamarat (ext. 1233) if you have any questions <br />or concerns with this assessment or approach. <br />Sincerely, <br />Bryce Romig <br />Environmental Manager <br />Climax Molybdenum Company <br />Enclosures: <br />1. Tailing Pond Hydrology Report <br />2. Barge System Certifications <br />3. Project Summary Reports <br />4. Hydrostatic Test Results <br />5. Barge Return Pipeline As-built Drawings <br />6. Barge Stability Report <br />7. Barge As-built Drawings <br />CC: M. Hamarat, Climax