as noted in our first and second quarter inspection reports, had not been repaired. In addition, three <br />additional shallow erosion channels have developed several hundred feet to the south. We recommend that <br />the channels be re-graded so that the drainage does not concentrate in these areas and cause further erosion. <br />It should be noted that at the time of our visit, we did not observe any signs of instability, structural <br />weakness or hazardous conditions at the pile. It should be noted that the internal roadways in the pile, as <br />well as the haul road were in good condition. <br />The stripping of the topsoil and cover materials in the refuse pile expansion area had also continued during <br />this quarter. Bower Brothers Construction had continued stockpiling the topsoil and cover materials in the <br />southern and eastern portions of the site. Bower Brothers Construction had also started construction of the <br />new haul road to the south of the existing pond. <br />As suggested, the water levels in the monitor wells installed on October 23, 1997 and December 9, 1999 <br />were measured during this quarter on a monthly basis.. A table and graphs showing the monthly water <br />levels are attached. <br />We were advised that the wash plants had produced approximately 75,621 tons of waste coal during the <br />month of July 2010: approximately 58,457 tons during August 2010: and approximately 64,693 tons during <br />September 2010. It is our understanding that the fines being produced at the wash plant, which consists of <br />approximately 10 to 20 percent of the total materials being produced, are being pumped underground into <br />the mine. <br />Based on our limited observations, it appears that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazard to human life and property at the site in its present condition is minimal. This report <br />fulfills the quarterly inspection requirements as specified by Rules 4.09.1(1 ])(a), 4.09.1(11)(b), 4.10.2(2)(a) <br />and 4.10.2(2)(b). <br />If you have any questions regarding this report or our observations, please contact this office. <br />Sincerely, <br />NWCC, INC., <br />O•• d•h?NF <br />Timothy S. Travis, P. 0?;0 <br />57 0 <br />Ip . <br />Reviewed by Brian D. 10 <br />••?,?? <br />S?pNA?,?c <br />cc: Jason Musick - Enviro ental Protection Specialist - CDRM&S <br />Job Number. 99-3983 NWCC, inc. Page 2.