My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-12_REVISION - M1994108
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994108
>
2010-10-12_REVISION - M1994108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:20 PM
Creation date
10/12/2010 9:56:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994108
IBM Index Class Name
REVISION
Doc Date
10/12/2010
Doc Name
Cost Summary Form AM-01
From
DRMS
To
Noland Inc
Type & Sequence
AM1
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 004 State :Colorado Permit/job #:M-1994-108 <br />Date : 0912212010 County: Montezuma Abbreviation :none <br />User : KAP Site : Cedar Point Filename : M108-004 <br />Permit or other job action :Amendment <br />Task description : Topsoil Replacement at 6 inch depth over 36 acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Equipment Description <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area :Cat D8R Series 11 - 8U (2005) <br />-Dump area : Cat D8R Series 11 - 8U (2005) <br />Road maintenance -Motor grader: NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer NA NA <br />% Utilization-machine : 100 NA 50 50 NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $80.67 NA $46.56 $46.56 NA NA <br />Operating cost/hour : $117.94 NA $35.31 $35.31 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $24.98 NA $38.54 $38.54 NA NA <br />Unit subtotals : $223.59 NA $120.41 $120.41 NA NA <br />Number of units : 2 0 1 1 0 0 <br />Group subtotals : Work : $447.17 Support: $240.82 Maintenance : $0.00 <br />Total work team cost/hour : $687.99 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 29,040 LCY factor <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor :NA <br />Loose <br />NA volume : 29,040 LCY
The URL can be used to link to this page
Your browser does not support the video tag.