oF.C COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />*?* PHONE: (303) 866-3567 <br />1876 %%302010 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the in o erat? <br />Mama <br />noted below. This report documents observations concerning compliance with tl4=0b? n <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Bear River S & G M-1986-040 Sand and ravel Routt <br />INSPECTION TYPE: INSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring Dustin M. Cza la August 17, 2010 12:30 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />Bear River Sand & Gravel Lester Crawford 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program Complete Bond $10,500.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA None None <br />WEATHER: T RCS SIGNATURE: SIGNATURE DATE: <br />Clear August 25, 2010 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover. as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Financial Warranty <br />PROBLEM/POSSIBLE VIOLATION: Problem: The financial warranty is not adequate to reclaim the site in <br />accordance with the approved reclamation plan. This is a failure to maintain the proper financial warranty <br />amount to complete reclamation of the affected lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act <br />CORRECTIVE ACTIONS: The operator shall submit adequate financial warranty, as determined by the <br />Division. The Division will be sending a separate surety.increase notice to the operator regarding the increase of <br />the financial warranty. The operator will have 60 days from the date on the surety increase notice to post the <br />additional financial warranty. <br />CORRECTIVE ACTION DUE DATE: 10/25/10 <br />SPFrfir TOPIC: Signs, Markers Ign vv,L,, <br />ot? o5wd at:the entmnce of <br />ji, <br />] i L ?`5 1 n __ r?c]u?rc, y'section:3.1.1 1) ofd` " f <br />fts. <br />Pagel of 4