My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-08_REPORT - C1981012
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981012
>
2010-10-08_REPORT - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:04 PM
Creation date
10/12/2010 7:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REPORT
Doc Date
10/8/2010
Doc Name
1st Quarter 2010 Wastebank Inspection Report
From
New Elk Coal Company, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G«?) l-o l 2 <br />New Elk Mine <br />QUARTERLY COAL WASTE BANK INSPECTION REPORT <br />CDMR Rules 4.09.1 (11) and 4.10.2(2) <br />Mine: NEW ELK <br />Waste Bank MSHA ID. No.: Development Waste Disposal Area <br />Inspection Period: First Quarter 2010 <br />Inspection Date: 3/10/2010 <br />General Description or Reference to Site Plan: <br />RECEIVED <br />OCT 0 C 2010 <br />Division of Reclamation, <br />IUtning and Suety <br />The Development Waste Disposal Area is located south of State Highway 12 and west of <br />the main facility Access Road. It is adjacent to and north of the Middle Fork of the <br />Purgatoire River. The area has been used for disposal of waste rock from the underground <br />mine. Since mine closure in 1989, the area has been used for disposal of sediment removed <br />from ponds and ditches located within the mine permit area. <br />Activity During Inspection: <br />The area was idle during the inspection. <br />Typical late winter conditions prevail with light snow on north facing slopes. Minimal precipitation <br />during January and February has resulted in fairly dry conditions. Sit is in good condition with <br />no problems observed. <br />Drainage: (Discussion of springs. seeps, overland and channel flow, underdrain construction and/or <br />discharge, integrity of 100-year 24-hour drainage structures, and evidence of positive drainage). <br />Positive drainage is maintained on the surface of the DWP. No evidence of springs nor seeps <br />was observed. <br />Observation of Fill Construction: (Description of material, compaction, lift thicknesses, slopes, <br />and construction methods). <br />Fill construction has been completed. Reclamation of the surface has been completed. <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.