Laserfiche WebLink
6. NATURE OF CONSTRUCTION ACTIVITY <br />Check the appropriate box(s) or provide a brief description that indicates the general n ature of the construction activities. (The full <br />description of activities must be included in the Stomhwater Management Plan.) <br />n Single Family Residential Development <br />o Mufti-Family Residential Development <br />a Commercial Development <br />Oil and Gas Production and/or Exploration (including pad sites and associated infrastructure) <br />n Highway/Road Development W including roadways associated with commercial or residential development) <br />a Other, Describe: Reservoir and Water Transfer System <br />7. ANTICIPATED CONSTRUCTION SCHEDULE <br />Construction Start Date: January 2011 Final Stabilization Date: January 2012 <br />S. RECEIVING /MATERS (if discharge is to a ditch or storm sewer, include the name of the ultimate receiving waters) <br />Immediate Receiving Water(s): <br />Ultimate Receiving Water(s): <br />Riverview Ditch and Arkansas River <br />Arkansas River <br />9. REQUIRED SIGNATURES (Both parts i. and ii. must be <br />The <br />either the owner and/or operator of the construction site. Refer to Part B of the <br />instructions for additional information. The application must be sinned by the applicant to be considered complete. jaA <br />ggm, it shall be signed as follows. <br />a) In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her duly <br />authorized representative, if such representative Is responsible for the overall operation of the facility from which the <br />discharge described in the application originates. <br />b) In the case of a partnership, by a general partner. <br />c) in the case of a sole proprietorship, by the proprietor. <br />d) In the case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected official, <br />or other duly authorized employee if such representative is responsible for the overact operation of the facility from <br />which the discharge described in the form originates. <br />STOPI: A_Stormwater Management Plan must be completed prior to signing the following certifica(,ionsl <br />1. Stormwater Management Plan Certification <br />°I certify under penalty of taw that a complete Stormwater Management Plan, as described in Appendix A of this application, has been <br />prepared for my activity. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for <br />gathering the information, the Stormwater Management Plan is, to the best of my knowledge and belief, true, accurate, and complete. I am <br />aware that there arffZV . t penalties for falsely certifying the completion of said SWMP, including the possibility of fine and <br />imprisonment for k a, s" <br />t W3o 1ro <br />or Authorized Agent <br />Name (printed) <br />li. Signature of Permit Legal Contact <br />Title <br />"1 certify under penalty of law that I have personally examined and am familiar with the information submitted in this application and all <br />attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the <br />information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the <br />possibility of fine or imprisonment. <br />°I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stomnwater Discharges <br />Associated with Construction Activity for the entirety of the construction sfoelproject described and applied for, until such time as <br />the application is amended or the certification is transferred, inactivated, or expired.* <br />Signature of Legally Responsible Person (submission must include original signature) Date Signed <br />Name (printed Title <br />Page 3 of 3 <br />DO NOT INCLUDE A COPY OF THE STORMWATER MANAGEMENT PLAN <br />DO NOT INCLUDE PAYMENT -AN INVOICE WILL BE SENT AFTER THE CERTIFICATION IS ISSUED. <br />Revised 412010