Laserfiche WebLink
Va-Ly- t vi VJ VVt-tytP _.._ . .. .,. ..,., _...._.-. <br />After site rehabilitation depletions will be compensated for <br />by direct releases of Windy Gap water from the Fort Collins <br />Sewage Treatment ptontheereplacement practicedPduring the mining <br />River, identically <br />phase. <br />After site rehabilitations the combined high-water surfaces <br />of the ponds will be determined by survey, and used thereafterthe <br />for the eermoofothe p rtion of ewater delivered.underothe <br />final determination <br />four ox Elder Ditch shares <br />made, tlallowingathetrestsofgthe <br />will <br />to the augmentation plan <br />water, not needed for replacement, to be used for landscape <br />irrigation on the same land. <br />During summer replacement the irrigation requirement will be <br />delivered into the ponds, as opposed to only the consumptive use <br />credit. Consequenty,ththere x'oughoutwill the summex, owhichotailnendgo back <br />into Box Elder Ditch, <br />the dutch will continuously theohistoricsreturnsflow, keeping the e <br />la Poudre River to <br />river whole. <br />Xn order to maintain historic return flow, however, <br />ensure and that as a <br />term and condition of this decree, Applicant shall <br />outflow from the pin theopothe ndsBfromlthe ditch for any fifteen <br />50% of the inflow into <br />(15) day period. Applicant shall install such measuring devices <br />as necessary to measure the inflow to and outflow from the ponds <br />and shall report said-measurements as part of its monthly <br />accounting required in Paragraph 24. <br />14. Plan will replace depletions. The evaporation of water <br />avaiproperty <br />1ab31itydtosdowof water nstream for <br />in the gravel m3nergeaaffectsubject <br />dust suppression <br />water rights. This plan for augmentation provides a method which <br />will supply replacement water to senior water rights for deple- <br />tions caused by out of priority diversions year-round in such a. <br />manner that said senior rights will not be injured because of <br />such depletions. <br />15. Plan contemplated by law. The plan is one contemplated <br />- <br />by law and will permit the depletions associated with ?he evapo <br />minin on <br />ration and dust suppression occurring in the gravel pit <br />vested <br />the subject property without adversely affecting any <br />water rights or decreed additional water rights in the Cache La <br />Poudre River or its tributaries, or in the South Platte River <br />basin. <br />7