My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-10-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
10/8/2010 7:17:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/7/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Week of 09/12/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecl* <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: September 18, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 9/12/10 through 9/18/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 47°F to 55°F (+/-) High: 75°F to 79°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No issues. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />No work performed during the week (see Figure 1 for previous subgrade acceptance). <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed using a Komatsu 300 excavator between stations A54+00 (+/-) <br />and A57+00 (+/-), approximately 0 to 50 feet left of centerline. <br />C) Cut to Fill <br />1) VLF <br />A CAT 385 excavator was used to excavate material from a designated area in the Cresson pit. <br />The material was loaded into CAT 777 haul trucks and hauled between stations A54+00 (+/-) <br />and A57+00 (+/-), approximately 0 to 50 feet left of centerline and between stations K8+00 <br />(+/-) and Kl 1+00 (+/-), approximately 200 to 220 feet left of centerline. Structural fill was <br />placed in 18" to 24" lifts using various CAT dozes. Each lift was moisture conditioned using a <br />CAT 773 water truck (when necessary) and compacted using a 10-ton vibratory smooth drum <br />VLF Weekly Report WE 09.18.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.