Laserfiche WebLink
Project: <br />• ' GEOTECH Client / On Site Rep: <br />Bowie Resources / Basil Bear <br />Bowie Mine Gob Pile Stability __..__.:._.__._....._.._.......------- ___..._._...-..___ ......:.:...._...._..___.,___..,__._.. <br />Civil, Structural & Geotechnicai Engineers <br />CO 81401 <br />222 South Park Ave <br />• Montrose Contractor / Rep: <br /> <br />Bowie Resources / Tracy M. <br />Project No: <br />2005126-CMT Date: <br />7/8/2010 . <br />, <br />Ph.: (970) 249.6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. 3ones <br />DAILY CO MPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT <br />% SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV FE E DENSITY <br />(pC0 MOISTURE <br />CONT, (%) DENSITY <br />(ptfi) CONTENT <br />(%) COMPACTION 1N <br />W <br />SPEC TYPE NUMBER <br />391 PT#4538 N 19195.15/E37849.61 6056.8 X 102.2 9.4 94.2 10.1 92.2 Gob 331A & 334 r/c @ 15% <br />392 PT#4539) N 19366.87/E37993.44 6064.6 X 98.5 9.9 91.5 13.4 92.8 cob 333 & 336 r/c @ 15% <br />393 (PT#4540 N19345.88/E37661.22 6091.0 X 96.9 10.2 91.8 13.2 94.7 Gob 339 & 340 r/c @ 14% <br />394 (P #4541) N 19317.90/E37547.84 6089.2 X 95.0 11.4 90.1 11.6 94.8 Gob 330A & 335 r/c @ 10% <br /> <br /> <br /> <br /> 1 <br />1 <br /> <br /> - <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 9007° + Cohesionless Soils Full Time: Day: 5 M T W Th <br />X F S <br />Sheepsfoot: 0 <br /> Part Time: A Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified x X Smooth Drum Roller: <br />Moisture Cohesive Soils <br />Requirement: N/A Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: I^ Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />ASTM Laboratory Testing Cohesive Soils <br />Procedure: D-69 6gg <br />Cohesionless Soils Tracy Matekovic Humidity: Dry <br /> <br />x Mod Humid <br />DENSITY / COMPACTION <br />ON THIS DATE FOR TESTING WAS NOT PERFORMED <br />THE FOLLOWING REASONS: 71nsufflticlent amount <br />erial placed. Informed (Rep of Company) of Test Results: <br />Tracy M. <br />Buckhorn was not informed prior <br />iv <br />ite that the <br />l <br />t <br />Contractor Not Working Due To: The Contractor Is: o our arr <br />a <br />on s <br />contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: Processing Wet Material: <br /> <br />Stripping and/or Grubbing: =Moisture Conditioning Dry Matt: Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Maul: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability CC-S7 7.19.10.xis DCR7-8-10gj#391