Laserfiche WebLink
Project: <br />' GEOTEC? Client / On Site Rep: <br />Bowie Resources / Basil Bear <br />Bowie Mine Gob Pile Stability _._...___..__.__--_.:......_...._..:_.......__._............_._....._...__.:._.._..:_ ....._._... <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. • Montrose, co 81401 Contractor / Rep: <br /> <br /> <br />Bowie Resources /Tracy M. <br />Project No: <br />2005126-CMT Date: <br />9/1/2010 Ph.: (970) 249-6828 - FAX: (970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY COMPACTIO N REPORT <br /> LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />411 (PT#4559) N19242.02/E37901.11 6067.7 X 98.7 10.0 101.0 11.5 102.3 gob 333/336 rc @ 14% <br />412 (PT#4560 N19343.24/E37980.61 6073.1 X 104.8 10.2 103.7 8.6 98.9 gob 354/355 rc 0 21% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: 9 /1/20 10 Compaction Equipment Used: <br />Compaction Cohesive Soils <br />Requirement: 90% + Cohesionless Soils Full Time: Day: 5 M T W <br />X Th F S <br />Sheepsfoot: <br /> Part Time: F 7X Weather: Sun Clear Overcast Rain Snow CAT 815 <br />Specified x X Smooth Drum Roller: <br />Moisture Cohesive Solis <br />Requirement: N/A Cohesionless Soils Number of Site Vi5its/Day: Temp: To 32 32-50 50-70 <br />X 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />ASTM Laboratory Testing <br />Procedure: D-698 Cohesive Soils <br />Cohesionless Soils <br />Tracy Matekovic <br />Humidity: <br />Dry <br />Mod <br />X <br />Humid <br />DENSITY / COMPACTION <br />ON THIS DATE FOR TESTING WAS NOT PERFORMED <br />THE FOLLOWING REASONS: Insufficient amount <br />of material placed. Informed (Rep of Company) of Test Results: <br />Tracy <br />Suckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor would not be workin <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material =Processing Wet Material: <br /> <br />stripping and/or Grubbing; Moisture Conditioning Dry Man: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: g <br />on this date. <br /> <br />L? <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable Mat'I: CM/GM: <br />Other: PAGE I OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability CC-S] 7.19.10.x15 DCR9-1-10gj#411