My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-07_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2010-10-07_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:24:50 PM
Creation date
10/7/2010 12:59:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
10/7/2010
Doc Name
3rd Quarter 2010 Wastebank Inspection Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: I <br />' GEOTECH Client / On Site Rep: <br />Bowie Resources / Basil Bear <br />Bowie Mine Gob Pile Stability Civil. Structural & Geotechnical Engineers <br />222 South Park Ave. • Montrose <br />CO 81401 Contractor /Rep: <br />Bowie Resources / Tracy M. <br />Project No: <br />2005126-CMT Date: <br />8/11/2010 , <br />Ph.: (970) 249.6828 • FAX: (970) 249.0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />G. Jones <br />DAILY CO MPACTION REPORT <br />- LOCATION TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) cOMPACTioN WITHIN <br />SPEC TYPE NUMBER <br />401 (PT#4548) N19260.07/E37913.40 6064.2 X 100.2 9.9 93.5 12.2 93.3 gob 333/336 rc 0 18% <br />402 (PT#4549) N19429.64/E38102.38 6068.3 X 101.1 10.0 95.8 11.6 94.7 gob 333/336 rc 0 14% <br />403 (PT#4550 N19315.03/E37475.33 6089.3 X 98.8 10.6 91.7 11.6 92.8 gob 330A/335 rc @ 19% <br />404 (PT#4551) N19307.52/E37582.25 6092.0 X 105.2 10.4 90.1 14.1 85.6 X gob 356016% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION J TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90%} Cohesive Soils <br />Requirement: Cohesiontess Soils Full Time: <br /> <br />- <br />- Day: <br />S M T w <br />X Th F S <br />Sheepsfoot: <br /> 7 <br />71 <br />Part Time: 17 <br />Weather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />Snow <br />CAT 815 <br />Specified x X Smooth Drum Roller: <br />Moisture ?/? Cohesive Soils <br />Requirement: Cohesiontess Soils Number of Site Visits/Day: Temp: To 32 32-50 50-70 70-85 <br />X 85 Up <br />Vibratory: <br /> Testing Only: I Wind: Still Mod High <br />ASTM Requested By (Company Name): X Other (List Below): <br /> <br />Laboratory Testing D-698 Cohesive Soils <br />Procedure: D-69 <br />Cohesionless Soils <br />Tracy Matekovic <br />Humidity: <br />Dry <br />Mod <br />X <br />Humid <br />DENSITY/ COMPACTION <br />ON THIS DATE FOR TESTING WAS NOT PERFORMED 7 <br />THE FOLLOWING REASONS: InSufffificient amount <br />of aterial placed. Informed (Rep of Company) of Test Results: <br />Tracy <br />Buckhorn was not informed prior <br />Contractor Not Working Due To: The Contractor Is: to our arrival on site that the <br />contractor wo <br />ld not be <br />o <br />kin <br /> <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br /> <br />Processing Frozen Material: Processing Wet Material: <br /> <br />stripping and/or Grubbing: Moisture Conditioning Dry Maul: <br />Field Copies Given To: <br /> <br />Contractor: <br />Client: u <br />w <br />r <br />g <br />on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unsuitable MaYI- CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine No. 2 Gob Pile Stability CC-S] 7.19.10.xls DCR8-11-10gj#401
The URL can be used to link to this page
Your browser does not support the video tag.