Laserfiche WebLink
ROADABLE EQUIPMENT __ ........:...._._ ..._,.:<:. <br />sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cycle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Equipment Equipmen <br />Haul time (hours) = 0.57 0.57 <br />Return time (hours) = 0.57 0.57 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.14 1.14 <br />Total non-roadable mob/demob cost * <br />* two round trips with haul rig <br />Total roadable mob/demob cost ** <br />** one round trip, no haul rig <br />JOB TIME AND COST <br />Total job time <br />Total job cost <br />Granby, Co <br />miles <br />mph <br />hours <br />EQUIPMENT HAUL DISTANCE and TIME