Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />...................................................................................................... . <br />PROJECT IDENTIFICATION <br />Task #: 002 State :Colorado Permit/job# :M1998034 <br />Date : 0811612010 <br />User : PSH <br />County : Grand <br />Site : Parshall Pit <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action : Conversion Bond Calculation <br />Task description : Replace Topsoil <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 14,750 LCY factor : NA volume : 14,750 LCY <br />Source of estimated volume : Conversion Permit Application <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />200 feet <br />491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />. Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />0.00 % (1 <br />8.040 feet <br />1,600 I bs/LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshiftlday) <br />Spoil pile : 0.70 (fnd-mo <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.44 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.63 <br />Adjusted unit production <br />Adjusted fleet production <br />308.01 <br />308.01 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 47.89 Hours <br />Unit cost : $0.529 /LCY Total job cost : $7,801 <br />Abbreviation :none <br />Filename :M034-002