My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-30_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2010-09-30_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:24:19 PM
Creation date
10/5/2010 7:30:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
9/30/2010
Doc Name
Letter & Application (email)
From
Twentymile Coal Company
To
DRMS
Type & Sequence
MR248
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? Similarly, use a track-hoe to excavate a trench for pipe placement across the stream channel, <br />placing the excavated material on the stream-bank. If stream underflow results in any <br />significant amount of water inflow to the trench excavation, a second portable pump will be <br />used to transfer this water to the suction pool upstream from the crossing disturbance area <br />? Place and properly bed the pipe in the trench (note that pipe will be pre-welded in a section <br />long enough to completely span the channel crossing, and drug into place) <br />? Backfill and compact the previously excavated material over the pipeline <br />? Grade bank areas at the pipeline crossing to blend with the upstream and downstream channel <br />banks <br />? Replace the previously excavated soil material <br />? Place rock armoring material over the backfilled excavation, to minimize the potential for <br />down-cutting <br />? Remove the upstream straw bale dam and discontinue pumping (the downstream straw bales <br />and silt fence will be left in place for approximately two weeks to catch residual sediment) <br />? Check for and clean-out any significant sediment accumulations above the downstream straw <br />bales <br />? Remove the downstream straw bales and silt fence <br />? Reseed bank disturbance areas in the spring <br />This submittal includes revised PAP text addressing the plan modification. Revised PAP materials are <br />limited to PAP pages 2.05-84.5, 84.6, 84.7 and 97.4, copies of which accompany this transmittal. <br />We would like to proceed with this project as soon as possible, to take advantage of favorable weather <br />and ground conditions during the 2010 construction season. We, therefore, appreciate your <br />consideration, cooperation, and assistance in facilitating timely review and approval of this revision <br />application. After you have opportunity to review the accompanying information, please feel free to <br />contact me with any questions or to discuss submittal materials or related matters. <br />Best regards <br />, LLC <br />Envirgr(meyltal Manager <br />cc: Alde_ Berdine/TC
The URL can be used to link to this page
Your browser does not support the video tag.