Laserfiche WebLink
GEORGE M.L. ROBINSONP.G <br />R 2 INCORPORATED J. ERICH RAUBERP.E. <br />ENVIRONMENTAL AND ENGINEERING SERVICES - - - -- <br />STRATEGICALLY POSITIONED- TECHNICALLY PREPARED ANDREW HARLEY <br />GINNY KING <br />MAY DAY IDAHO MINE COMPLEX <br />WILDCAT MINING CORPORATION <br />ORIGINAL 112(d) PERMIT <br />Geotechnical Stability Exhibit <br />Rule 6.5 <br />(1) Table 1 is a summary of the geologic hazards that have been identified for the geologic <br />formations associated with the May Day Idaho Mine Complex: <br />1�1 <br />May Day Idaho Mine Complex 112(d) Permit Application <br />September 21, 2010 <br />"Strategically Positioned — Technically Prepared" <br />5555 DTC Parkway Suite A -4000, Greenwood Village, Colorado 80111 <br />Phone: (303)832-7664, Fax: (303)832-7469 <br />