My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-01_REVISION - C1981010 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-10-01_REVISION - C1981010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:09 PM
Creation date
10/1/2010 3:11:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/1/2010
Doc Name
Map 1 Sheet 2 of 3 SL-12 Phase 2 Bond Release Area Delineation
From
Trapper Mining Inc.
To
DRMS
Type & Sequence
SL12
Email Name
RDZ
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPER MINE C:Me 9',S <br />400 <br />0 400 800 1200 <br />SL -12 PHASE 2 <br />SCALE: , IN - 400 FT BOND RELEASE <br />CONTOUR INTERVAL: 10 FEET <br />AREA DELINEATION <br />,.^ \v\ Sheet 2 <br />0. TOPSOIL DRAINAGE CORRIDORS REMOVED FROM of 3 <br />S " p ate POWERLINE HAULAGE M PROPOSED PHASE III BOND RELEASE BOUNDARY S CALE: 1 = aoo <br />y �' / HAULAGE/ DRAINAGE L OCATION INDEX X/ DESIGNED BY: FMS <br />Topographic information compiled from aerial photography dated 10/10. <br />i � i i 70NAL C' 4i qlf llUp \ \ \j\ J L V <br />� GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Minescape File: : Proiects\Environmental\suz _phosez_ pro <br />DRAWN BY: BDN.RDH MAP 1 <br />DATE: 9/21/10 SHEET 2 N <br />E - - _ = PROPOSED <br />PHASE I <br />BOND RELEASE BOUNDARY <br />- - - - - - - - - - - - - PERMIT BOUNDARY <br />- - - - APPROVED <br />PHASE 1 <br />BOND RELEASE BOUNDARY <br />- RECONSTRUCTED DRAINAGE <br />James M a registered Professional Engineer <br />at f Col o <br />this p <br />%' �`,< <br />experts, <br />gOoRd� t od o ndlti ona l li n o a rma tion provided pe <br />( - `1 PROPOSED <br />PHASE II <br />BOND RELEASE BOUNDARY <br />® EXISTING STOCK POND <br />the information is true nd correct to the <br />O ryiy,'knowl <br />Qi + e, \� s}5, f 'knowledge and information. <br />- - - - APPROVED <br />PHASE II <br />BOND RELEASE BOUNDARY <br />J © C / \`._rte �_ <br />' `r <br />1 ' PROPOSED <br />PHASE <br />III Block A,D,H Pits, RSAB, 96 -98 <br />2 0537 - James M. Mattern. CO PE No. 20537 <br />, <br />14� 1 1 0 I l i I F I f a l p <br />APPROVED <br />PHASE III <br />BOND RELEASE BOUNDARY <br />TRAPPER MINE C:Me 9',S <br />400 <br />0 400 800 1200 <br />SL -12 PHASE 2 <br />SCALE: , IN - 400 FT BOND RELEASE <br />CONTOUR INTERVAL: 10 FEET <br />AREA DELINEATION <br />,.^ \v\ Sheet 2 <br />0. TOPSOIL DRAINAGE CORRIDORS REMOVED FROM of 3 <br />S " p ate POWERLINE HAULAGE M PROPOSED PHASE III BOND RELEASE BOUNDARY S CALE: 1 = aoo <br />y �' / HAULAGE/ DRAINAGE L OCATION INDEX X/ DESIGNED BY: FMS <br />Topographic information compiled from aerial photography dated 10/10. <br />i � i i 70NAL C' 4i qlf llUp \ \ \j\ J L V <br />� GD -3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Minescape File: : Proiects\Environmental\suz _phosez_ pro <br />DRAWN BY: BDN.RDH MAP 1 <br />DATE: 9/21/10 SHEET 2 N <br />
The URL can be used to link to this page
Your browser does not support the video tag.