My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-24_ENFORCEMENT - M1977300
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977300
>
2010-09-24_ENFORCEMENT - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:28 PM
Creation date
10/1/2010 2:21:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
ENFORCEMENT
Doc Date
9/24/2010
Doc Name
Complaint for Judicial Review, Declaratory and Injunctive Relief
From
Cotter Corporation
To
DRMS
Violation No.
MV2010018
Email Name
AJW
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
145 <br />1 was published, and then it got significantly better, <br />2 and now look where it is. 2007-2008, another mine <br />3 flooding strategy that's failed. <br />4 Here's five more. The operator has <br />5 mentioned the Dinero Tunnel. We don't even have any <br />6 water quality data yet, so how can we assess if it's <br />7 been a successful remediation strategy in terms of <br />8 geochemical stabilization? <br />9 This last one, this is another sample <br />10 that the operator provided. The Iglesias District, <br />11 Monteponi, Sardinia. This is primarily metal <br />12 cations in a carbonate system. It's not a very <br />13 appropriate analog for Schwartzwalder. The <br />14 attenuation is inconsistent. Where I've marked with <br />15 arrows are some data that looks like it's not really <br />16 being attenuated. It is actually either flattening <br />17 or slightly increasing. The majority of them are <br />18 showing that. <br />19 The operator has said that dewatering <br />20 poses substantial physical feasibility challenges in <br />21 installing a pump, pipe, or other equipment into the <br />22 mine. Setting a pump at 500 feet below the Steve <br />23 Level involves significant technical challenges. <br />24 DRMS's position is that this is not <br />25 exceedingly difficult. To prevent damage the pump
The URL can be used to link to this page
Your browser does not support the video tag.