Laserfiche WebLink
TR-68, Permanent Light-Use Road Documentation <br />Response to Comments - Round 3 <br />• Page 2 <br />7. Page 20-2.4 states that the landowner request for permanent retention of Ponds 005, 006, 009, 015, <br />016, and 017 are contained in Appendix 20-2.1. The previously approved (current) page 20.2. 5 also <br />indicated that "SCC is waiting on receipt of some letters "; that language was omitted in the revised <br />version. It would appear that this language may have been erroneously omitted, as SCC has provided <br />the landowner request only for permanent retention of Pond 006, located on SCC/Sage Creek lands, <br />and Ponds 015 and 017, which are located on the Ricks property. None of the other letters provided <br />include provisions for any sediment ponds. <br />Please either provide documentation that pertinent landowners have requested permanent retention <br />of Ponds 005, 009, and 016; remove Ponds 005, 009, and 016 from the list of permanent structures <br />on page 20-2.4 and on Exhibit 20-2; or note that the landowner requests will be submitted prior to <br />any Phase I bond release request. <br />Response: The text has been revised per request. <br />8. Page 20-2.4 states that the landowner request for permanent retention of Stock Ponds T-2, 3, S, 18, <br />20, 22, 24, 25, 26, and 27 are contained in Appendix 20-2.1. The previously approved page20-2. S <br />also indicated that SCC was waiting on some of the letters, but again that language is now omitted. <br />SCC has provided the landowner request only for permanent retention of Tank S, located on <br />• SCC/Sage Creek lands, and Tanks 25, 26, and 27, which are located on the Friedrich property. <br />Again, none of the other letters provided include provisions for any stock tanks. <br />Please either provide documentation that pertinent landowners have requested permanent retention <br />of Tanks T-2, 3, 18, 20, 22, and 24; remove Tanks T-2, 3, 18, 20, 22, and 24 from the list of <br />permanent structures on page 20-2.4 and on Exhibit 20-2; or note that the landowner requests will <br />be submitted prior to any Phase I bond release request. <br />Response: The text has been revised per request. <br />Sincerely, <br />Roy A. Karo <br />Reclamation Manager <br />cc: Carl Johnston (OSMRE) <br />Jennifer Maiolo (BLM) <br />Sandy Brown (DRMS-Denver) <br />• <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-5219 9 FAX (970) 276-5222