Laserfiche WebLink
<br />Table L-2 (Continued) <br />May Day Idaho Mine Complex <br />Bonding Cost Summary (e) <br />Estimated Reclamation Costs <br />Wildcat Mining Company <br />Hesperus, Colorado <br />Task No Task Description Unit Rate # of Units Task Hours Costs <br />4 LAMB MINE ROCK SITE RECLAMATION <br />Dirrrt cnett <br />0 <br />Top Soil/Growth Media (Not <br />required) $$$/hour $0 0.0 $0 <br />Regrade Disturbed Lamb Rock <br />Disposal Area $$$/hour $110 16.0 $0 $1,760 <br />Tilling/Acre $$$/Acre $90 1.0 $0 $90 <br />Seed Mix $$$/Acre $150 1.0 $0 $150 <br />Reve etate $$$/Acre $200 1.0 $0 $200 <br />BMPs including installation $$$/Acre $1,500 1.0 $0 $1,500 <br />Amendments $$$/Acre Not Required 0.0 $0 $0 <br />Weed Control $$$/Acre $150 1.0 $0 $150 <br />Rip Compacted Area $$$/hour $150 1.0 $0 $150 <br />Mob/Demob Lump Sum $2,000 1.0 $0 $2,000 <br />Mine Area Sub_Total Direct $6,000 <br />I;otal Direct M),vuuI <br />Indirnrt f nstc <br />Liability Insurance 2.02 % of Direct 0.0 0 $121 <br />Performance Bond 1.05 % of Direct 0.0 0 $63 <br />Superintendent $$$/hour $80 16.0 0 $1,600 <br />Profit 10 % of Direct 0.0 0 600 <br />Total Operating & Profit $2,384 <br />• <br />Total Lamb Reclamation Costs <br />$8,384 <br />Page 4