My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-29_REVISION - M1981185 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2010-09-29_REVISION - M1981185 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:59 PM
Creation date
10/1/2010 10:41:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/29/2010
Doc Name
Conversion Application for a 112(d) Permit Part 2 Exhibit I Attachment 2 thru S
From
Wildcat Mining, Co.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Table L-2 (Continued) <br />May Day Idaho Mine Complex <br />Bonding Cost Summary (e) <br />Estimated Reclamation Costs <br />Wildcat Mining Company <br />Hesperus, Colorado <br />Task No Task Description Unit Rate # of Units Task Hours Costs <br />2 MAY DAY NO. 1 MINE SITE RECLAMATION <br />n:ro..+ ("ncrc <br />• <br />Top Soil/Growth Media (not <br />required) $$$/Acre $0 0.0 0 $0 <br />Re grade $$$/hour $110 100.0 0 $11,000 <br />Regrade May Day No. 1 Extended <br />Bench Area $$$/hour $110 8.0 0 $880 <br />Tilling/Acre $$$/Acre $90 1.0 0 $90 <br />Seed Mix $$$/Acre $150 1.0 0 $150 <br />Reve etate $$$/Acre $200 1.0 0 $200 <br />BMP including Installation $$$/Acre $1,500 1.0 0 $1,500 <br />Amendments $$$/Acre Not Required 0.0 0 $0 <br />Weed Control $$$/Acre $150 1.0 0 $150 <br />Mill Removal-Portal Collapse $$$/hour $150 16.0 0 $2,400 <br />Rip Compacted Area $$$/hour $150 4.0 0 $600 <br />Mob/Demob Lump Sum $2.000 1.0 0 1L O-00 <br /> Mine Arc,i Sub Total Direct S18,970 <br /> TStalDirect $$$.;, 516,7.70 <br />r..a:---+ !`no+o <br />Liability Insurance 2.02 % of Direct 0.0 0 $339 <br />Performance Bond 1.05 % of Direct 0.0 0 $176 <br />Superintendent $$$/hour $80 88.0 0 $7,040 <br />Profit 10 % of Direct 0.0 0 1 677 <br />Total Operating, &.Profit $9,232 <br />• <br />Estimated May Day No. 1 Reclamation Costs <br />31Ld,UUL <br />Page 2
The URL can be used to link to this page
Your browser does not support the video tag.