Laserfiche WebLink
VIC101 TAI N COAL <br />MPANY L.L.C. <br />A Subsidiary d Arch Western Biturrrirxws Group. LLC <br />September 29, 2010 <br />West Elk Mine <br />P.O. Box 591 <br />5174 Highway 133 <br />Somerset, CO 81434 <br />(970) 929.2200 <br />Fax (970) 929.5050 <br /> <br />Mr. Tom Kaldenbach - <br />Colorado Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Mountain Coal Company, LLC, West Elk Mine; Permit No. C-1980-007; Minor <br />Revision No. MR-370, Concrete Slab for Substation Capacitors. <br />Dear Mr. Kaldenbach: <br />Mountain Coal Company, LLC (MCC) submits this letter and application form in application of <br />Minor Revision No. MR-370 to add a concrete slab at the Sylvester Gulch Substation. The <br />reinforced concrete slab, measuring 8' wide by 32' long by 12" thick, is needed to stabilize a <br />bank of capacitors for the longwall system in the mine. MCC would like to begin construction <br />of this slab as soon as possible and would appreciate your expeditious review and approval <br />Please contact me at (970) 929-2238 or by e-mail should you have questions regarding this <br />submittal. <br />Sincerely, <br />kt,"MeN;W A& <br />Kathleen G. Welt, <br />Environmental Engineer III <br /> <br />cc: Doug Nolte - MCC <br />Joanne Williams - Gunnison Co.