My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-30_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2010-09-30_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:24:14 PM
Creation date
9/30/2010 2:20:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
9/30/2010
Doc Name
Letter & Cost Estimate
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR125
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-1981-038 <br />Miner Ravicinn 125 <br />PROJECT IDENTIFICATION <br />Date : 29-Oct-10 Permit C-1981-038 Site: Bowie No. 1 Mine <br />User: JRS State : Colorado <br /> Filename: C038-270 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Minor Revision 125 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />271 Plug and Seal Gob Vent Boreholes GVB-10A and GVB-10B 16.00 $7,731 <br />272 Regrade Drill Pads 18.63 $3,755 <br />273 Regrade Light-Use Road 10.24 $2,064 <br />274 Replace Topsoil from Stockpile to Drill Pads 7.20 $1,452 <br />275 Replace Topsoil from Stockpile Light-Use Road 3.96 $798 <br />276 Reseed Drill Pads - 4.00 $3,082 <br />277 Reseed Light-Use Road 2.20 $1,695 <br /> <br /> Direct Cost Total 62.23 $20,577 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $319 <br /> Performance Bond (1.05% of Direct Costs) $216 <br /> Job Superintendent (at $51.20/hour) 31.12 $1,593 <br /> Profit (10.00% of Direct Costs) $2,058 <br /> <br /> <br /> Total Overhead and Profit $4,186 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $24,763 <br /> <br /> Legal - Engineering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $1,052 <br /> Reclamation Management and Administration (3.25% of Contract) $805 <br /> <br /> <br /> TOTAL BOND AMOUNT $26,620 <br />jrs Page 1 29-09-10
The URL can be used to link to this page
Your browser does not support the video tag.