My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-29_REPORT - M1975009
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1975009
>
2010-09-29_REPORT - M1975009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:29:23 AM
Creation date
9/30/2010 12:50:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1975009
IBM Index Class Name
REPORT
Doc Date
9/29/2010
Doc Name
Annual Fee/Report/Map
From
Lakewood Brick & Tile Company
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notice of Intent to Continue Mining Operations <br />110 (2) Annual Report <br />Permittee Name: The Lakewood Brick and Tile Company <br />Permit No.: M-1975-009 <br />Operation Name: Doughty's Pit <br />Anniversary Date: September 30, 2010 <br />Total: $323.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 5.00 b. County where mine is located: Jefferson <br />2. Has your mine been grated a TEMPORARY CESSATION STATUS? YES NO <br />Does your mine operate MORE or LESS than 180 days per year MORE LESS <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE ESS <br />3. Do you have a phased reclamation plan? YES NO <br />4. Total acres affected during the report rear:* <br />0.25 <br />5. Total acres reclaimed for the report year:* 0.00 <br />6. Total acres in various stage of reclamation:* 0.00 <br />a. Backfilled: NA d. Topsoil Replaced: NA <br />Average topsoil thickness <br />b. Graded: NA replaced: NA <br />c. Seeded: NA <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic materials or soil conditioners used for <br />the report year:* NA <br />8. Estimated total acres to be affected in the next report year:* No new area <br />9. COMMENTS: Mining has continued in areas disturbed in past years in the southern mining area. <br />No new area will be disturbed this coming year since very little material is removed from this mine <br />yearly. No reclamation is required at this time. Please see the 2009 Annual Report Map for <br />location of areas discussed below. The yellow area is where mining is See page 2 <br />* Please show the location of the acreage for items 4 - 6 on your map. Indicate the phases of <br />the reclamation which have been completed, correlated with your timetable. <br />** NOTE: If there have been any changes sin the last annual report and you previously submitted <br />a map which correctly depj'ds the Aien acreage in items 2 through 6, then a new map is <br />unnecessary. However, y X. must t ' fact above. <br />Signature: <br />Please type or pr <br />Date: '5 & 1 <br />and phone number below: <br />Contact Name: / Thomas Murray Phone: (303) 238-5313 <br />Company: The Lakewood Brick and Tile Company <br />Address: 1325 Jay Street <br />Denver. CO 80125
The URL can be used to link to this page
Your browser does not support the video tag.