My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-28_REVISION - M1980047 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980047
>
2010-09-28_REVISION - M1980047 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:45 PM
Creation date
9/30/2010 10:01:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
REVISION
Doc Date
9/28/2010
Doc Name
Letter and Application TR13
From
ExxonMobil
To
DRMS
Type & Sequence
TR13
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />1) Survey Plats for Water Monitoring wells: <br />• EF -V2, EF -V3 and EF -V4. <br />• EF -AWL <br />2) Wellbore Sketches for Water Monitoring wells: <br />• EF -V2, EF -V3 and EF -V4. <br />• EF -AW 1. <br />3) Reclamation cost estimate for the four Water Monitoring wells: <br />With 4 inch ID casing and depths of 170 feet for EF -V2, EF -V3 and <br />EF -V4 and 300 feet for EF -AW1, the total volume to fill with cement <br />is 71 cubic feet. Each 170 foot well has a capacity of 15 cu ft and the <br />300 foot well has a 26 cu ft capacity. <br />• Typically a 94 -1b sack of cement (Type I /II) fills a volume of 1.28 <br />cubic feet. So, fifty -five sacks of cement are required to cement all <br />four wellbores to surface. <br />• A typical pallet of cement contains 40 sacks. So, two pallets or 80 <br />sacks will be required. At $10 /sack this will be $800. <br />• Labor cost for 2 days work by 2 people (10hrs /day, $100 /hr) will <br />be $4000. <br />• Rental of a cement mixer /pump (2 days @ $100 /day) will be $200. <br />• Rental of an air compressor (2 days @ $100 /day) will be $200. <br />• Rental of a Pickup Truck (2 days @ $100 /day) will be $200. <br />• Hotel and food for the crew will be $300. <br />Total reclamation cost for the four wells is estimated to be $5700. <br />With 50% contingency, the total cost is $8500. <br />Technical Revision Submittal <br />
The URL can be used to link to this page
Your browser does not support the video tag.