4. Remaining Items to be Completed <br />Listed below are the Yule Quarry items to complete the work for the Amendment of 2010: <br />1) Clean out flagged portions of Collection Ditch #5 leading to Sump 5. The flags were marked by <br />Greg Lewicki during the September 16 inspection. <br />2) Add facilities sump to plan (no work on site). <br />3) Add vertical markers on Collection Ditch 5 to Sump 5 for snowplowing. <br />4) Dig entrance water bar and/or culvert into Sump 2. <br />5) Get 40 lbs of seed (same as in the reclamation plan) for broadcast on the roads from Sumps 2, 3 and <br />4 as well as berms and any other disturbance in the area. This seed must be broadcast in the next 2-3 <br />weeks, or before October 15, 2010. <br />6) In Sump 4, drop the emergency spillway a height of 4 inches over 4 feet length where the rock is on <br />the outside slope. <br />7) In Sump 1, build up the current location of the emergency spillway to the same height as the rest of <br />the dam and make a new emergency spillway, approximately 4 feet wide and 4-6 inches lower than the <br />top of the dam so that the water flows away from the road and any other area that drains to Sump 2. <br />Also in Sump 1, add bentonite to the area where the principal spillway pipe enters the berm to ensure <br />that the pond is sealed. <br />8) Install a water bar just uphill of the generator so that the collection ditch flow crosses the road, goes <br />on the side of the parking area and makes its way to Sump 2. <br />9) The measured area and height for Sump 2 shows that it contains slightly less volume than the <br />design. See attached sheet for Sump 2. This sump needs to be built 1 foot higher along the outside. <br />Since the north side of the sump is the steep slope and the west and south sides have the access road <br />tilted toward the sump, the only side that needs to rise is the east side. This is the side between the road <br />and the steep slope. The material must be compacted as it is placed. The emergency spillway must also <br />rise 1 foot and 6" diameter rock must be placed on the outside slope of the spillway. <br />It is my understanding that Cedric Beggar of Colorado Stone is working on these items and they <br />should be completed soon. <br />Fines generated from future quarry operations should not be allowed to be placed anywhere on the <br />surface area of the mine. <br />Yule Quarry As Built Report 2010 9