Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 02a State : Colorado Permit/job# : M-1977-443 <br />Date : 0912212010 County :Moffat Abbreviation :none <br />User : DMC Site :Moon Pit No. 2 Filename :M443-02a <br />Agency or organization name: DRMS <br />Permit or other job action :110c SDG <br />Task description :Replace Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 240 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> <br />Utilization % _ <br />Cost Breakdown : Ownership cost/hour : $40.93 NA <br /> Operating cost/hour : $49.75 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $129.22 Total fleet cost/hour : $129.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,700 L CY factor : NA volume : 6,700 LCY <br /> <br />Source of estimated volume :5 acres at 10" depth <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 410.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.70 _ (fnd-mf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,375 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.69 <br />Weight description <br />Top Soil Adjusted unit production : 282.95 LCY/hr <br /> Adjusted fleet production : 282.95 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 23.68 Hours <br />Unit cost : $0.457 /LCY Total job cost : $3,060 <br />