My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_INSPECTION - M1998003
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1998003
>
2010-09-22_INSPECTION - M1998003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:18 PM
Creation date
9/29/2010 10:28:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998003
IBM Index Class Name
INSPECTION
Doc Date
9/22/2010
Doc Name
Inspection Report
From
DRMS
To
3B Enterprises, LLC
Inspection Date
9/14/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 22-Sep-2010 Permit or job no. M-1998-003 Site :Raftopoulos Pit #1 <br />_ <br />User : DMC Abbreviation : none State :Colorado <br />Filename : M003-000 <br />Agency or organization name: DRMS Permit or job action :112c SDG <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Highwall reduction dozer 1 42.2 $6,574 <br />02a -Replace topsoil dozer 1 52.0 $8,110 <br />03a -Revegetate disturbed area revege 1 40.0 $5,834 <br />04a -Mobilize reclamation crew/equipment mobilize 1 10.0 $2,595 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />su3TOTALS: 144.3 $23,113 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST $23,113 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total= $467 <br />Performance bond <br />Job superintendent <br />Profit <br />1.05 <br />NA* <br />10.00 <br />County :Moffat <br />% of direct total= $243 <br />NA NA total = NA <br />% of direct total = $2,311 <br />* not required (or eqp. operator serves as super.) TOTAL O & P $3,021 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct+ O & P) _ $26,134 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total=--- -,. NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,307 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $4,328 <br />TOTAL BOND AMOUNT (direct + indirect) _ $27,441
The URL can be used to link to this page
Your browser does not support the video tag.