CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 23-Sep-2010 Permit or job no. M-1995-012 Site :Powell'S Gravel Pit <br />User : DMC Abbreviation : none State :Colorado <br />Filename: M012-000 County :Moffat <br />_ <br />Agency or organization name: DRMS <br />Permit or job action :110c SDG <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Removal of unstable outcrop blasting 1 60.0 $2,171 <br /> The above task may not be required to stabilize rock outcrop. <br /> TBD through further inspection and/or engineer's evaluation. <br />_ <br />02a -Grade slopes to 3HAV dozer 1 2.42 ______$313 <br />03a -Revegetate disturbed area revege 1 40.0 $4,157 <br />04a -Mobilize reclamation crew/equipment mobilize 1 2.5 $670 <br />--- <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 104.9 $7,311 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST $7,311 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability insurance : 2.02 % of direct total = $148 <br />Performance bond : 1.05 % of direct total = $77 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $731 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $956 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $8,267 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $50_0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $413 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $1, 869 <br />TOTAL BOND AMOUNT (direct + indirect) _ $9,180