My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-23_INSPECTION - M1995012
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1995012
>
2010-09-23_INSPECTION - M1995012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:25 PM
Creation date
9/29/2010 10:28:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995012
IBM Index Class Name
INSPECTION
Doc Date
9/23/2010
Doc Name
Inspection Report
From
DRMS
To
Cecil C Powell
Inspection Date
9/15/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHRUBS AND TREES (seed) : <br />MULCHING and MISCELLANEOUS <br />Materials item no. 1 : <br />item no. 2: <br />item no. 3: <br />item no. 4: <br />DESCRIPTION (data source) UNITS / ACRE UNIT COST / UNIT COST/ACRE <br />Straw, delivered (DMG survey data) 2.00 ton $110.50 -.$221.00--- <br />Herbicide - 2,4D @ 1 Ib/ac. 1.00 acre $8.55 $8.55 <br /> <br /> <br />Application - method no. 1 : Crimping, with tractor (DMG survey data) <br />method no. 2: Weed spray, truck, non-aquatic area, nox. [DMG] <br />method no. 3 : <br />rizza.aa <br />$62.32 <br />$56.93 <br />TOTAL MULCH APPLICATION COST / ACRE : $119.25 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST / PLANT COST / PLANT PELLET COST/PLANT COST/ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY 51 OCK GU51 I AGKE : W.UU <br />JOB COST No. of acres 4.00 Cost / acre : $692.91 INITIAL JOB COST : $2,771.65 <br />Estimated failure rate (percent) : 50.00% Cost / acre*: $692.91 RESEEDING JOB COST : $1,385.82 <br />* Selected replanting work items : F T S M TOTAL JOB COST:-- $4,157 <br />TOTAL MULCH MATERIALS C05T / AGKE <br />FORBS : sheet 2 of 2 <br />TOTAL SEEDS / SQ. FT.: 44.1 * TOTAL POUNDS PLS / ACRE : 13.00 ' TOTAL SEED MIX GUS I I AGKE : 4b7I7.Z/ <br />Seed application - method : Drill seeding (DMG survey data) TOTAL SEED APPLICATION COST / ACRE : $85.23
The URL can be used to link to this page
Your browser does not support the video tag.