Laserfiche WebLink
of the CIBP) to 12 feet below ground level (Figure 1). The remaining surface casing was <br />filled with native fill, cut off below surface, and a dry hole marker was welded onto the <br />well head prior to reclamation of the pad. <br />Daub & Associates, Inc. Page 6 of 7 Printed: 9/21/2010 <br />]A-5HR Plug and Abandonment Report