Laserfiche WebLink
g6kOO x \ \ <br />B?kOp F6XOp o0 \?`??? <br />B?kDG F?'CDO F lp ?0 <br />8XQ? <br />? F1 <br />0 <br />0 <br />+1. <br />OOk ? <br />C7 <br />oo <br />e0 <br />O0?ptp <br />O <br />O <br />k <br />N <br />r <br />O <br />00? <br />?c <br />O <br />O <br />+ <br />CO <br />O <br />o° <br />?X <br />1 <br />O° <br />Ox <br />?ry <br />AN <br />J <br /> <br /> <br />?r <br />z <br />0 <br />0 <br />N <br />Z <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />- PREVIOUSLY DEPLOYED LINER <br />i-- ?? DEPLOYED LINER <br />N TES: <br />APPROXIMATELY 93,129 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 2,616,404 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />GOLD MINING COMPANY <br />NOIECT <br />PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA SECONDARY 100 MIL <br />DESIGNED BY CMT CNECKED 8Y JON DATE <br />DRAWN BY CUT APPROVED BY JON 09/11/10 <br />EARTH AND ENVIRONMENTAL ENTAL _ C= mDwE rtsat K Na vsv <br />3c 0