Laserfiche WebLink
Table No. 4 <br />Mountain Park Concrete <br />Dawson Gulch Spring <br />Water Use Summary <br />Applegate <br />Group, inc. <br />Date Revised: 6/30/2009 <br />AG Job #: 07-125 <br />Month Irrigation <br />Consumptive <br />Use <br />(acre-feet) <br />A Industrial <br />Consumptive <br />Use <br />(acre-feet) <br />C Evaporative <br />Consumptive <br />Use <br />(acre-feet) <br />B Total <br />Consumptive <br />Use <br />(acre-feet) <br />D Replacements <br />from CRWCD <br />Lease <br />(acre-feet) <br />E Net Credit <br />to River <br /> <br />(acre-feet) <br />F <br />January 0.00 0.00 0.01 0.01 0.10 0.09 <br />February 0.00 0.00 0.04 0.04 0.10 0.06 <br />March 0.00 0.00 0.09 0.09 0.10 0.01 <br />April 0.00 0.00 0.13 0.13 0.20 0.07 <br />May 0.03 0.33 0.18 0.53 0.60 0.07 <br />June 0.17 0.55 0.22 0.94 1.00 0.06 <br />July 0.18 0.55 0.23 0.96 1.00 0.04 <br />August 0.15 0.55 0.19 0.89 1.00 0.11 <br />September 0.06 0.28 0.16 0.49 0.50 0.01 <br />October 0.00 0.00 0.11 0.11 0.20 0.09 <br />November 0.00 0.00 0.06 0.06 0.10 0.04 <br />December 0.00 0.00 0.02 0.02 0.10 0.08 <br />Total 0.59 2.26 1.44 4.29 5.00 0.71 <br />Notes: <br />(A) Irrigation consumptive use from Table No. 1 <br />(B) Industrial consumptive use from Table No. 2 <br />(C) Evaporative consumptive use from Table No. 3 <br />(D) Total consumptive use = (A) + (B) + (C) <br />(E) Replacements made from CRWCD Lease of 5.0 acre-feet per year in Wolford Mountain Reservoir <br />(F) Net credit to river = (E) - (D) <br />N:\07125 Mt Park Concrete\water rights\BG 1- Parshall Pit\Water Use Summary.xlsx