Laserfiche WebLink
Table No. 2 <br />Mountain Park Concrete <br />Dawson Gulch Spring <br />Industrial Consumption <br />From Gravel Washing Process <br />Date Revised: 6/30/2009 <br />AG Job #: 07-125 <br />Month Monthly, <br />Production <br />Percentages <br />A Aggregate <br />Production <br />(tons) <br />B Water Retained <br />in Product <br />(gallons) <br />C Water Retained <br />in Product <br />(acre-feet) <br />D <br />January 0.0% 0 0 0.00 <br />February 0.0% 0 0 0.00 <br />March 0.0% 0 0 0.00 <br />April 0.0% 0 0 0.00 <br />May 12.5% 9,375 106,910 0.33 <br />June 25.0% 18,750 179,821 0.55 <br />July 25.0% 18,750 179,821 0.55 <br />August 25.0% 18,750 179,821 0.55 <br />September 12.5% 9,375 89,910 0.28 <br />October 0.0% 0 0 0.00 <br />November 0.0% 0 0 0.00 <br />December 0.0% 0 0 0.00 <br />Total 100.0% 75,000 736,284 2.26 <br />Material Mined Per Year= 75,000 tons based on mine permit <br />Moisture Content of Product = 4% per guidelines from the State Engineer's Office <br />Initial Fill Volume of Clarifier = 17,000 gallons based on information from JADAIR <br />Notes: <br />(A) Estimated monthly production percentages. Provided by Mountain Park Concrete <br />(B) Aggregate production = (Material Mined per Year) * (A) <br />(C ) Water retained in product calculated as 4% by weight of aggregate production. Month of May includes initial fill volume of clarifier <br />(D) Gallons to acre-feet conversion <br />Applegate <br />Group, Inc. <br />N:\07125 Mt Park Concrete\water rights\BG 1- Parshall Pit\Water Use Summary.xlsx