Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check one): <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />Lj Cropland(CR) " Pastureland(PL) <br />? Rangeland(RL) ID Forestry(FR) <br />Residential(RS) _l_J Recreation(RC) <br />Developed Water Resources(WR) <br />13. <br />Cropland(CR) <br />Rangeland(RL) <br />Pastureland(PL) <br />Forestry(FR) <br />Residential(RS) " Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material from banks and take to crusher, & wash plant. <br />15. On Site Processing: • Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />C:n,sh and wash rock and sand for the use of making concrete, and other construction materials. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />Nnno <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />We are converting our limited 11_Qer i t to a regular 112 The limited 110 permitted acreage <br />sets within the boundary of a 42.430 acre parcel which we are permitting. This is being done to <br />permitting this acreage it will allow both Grand County and Mountain Park Concrete,lnc. to make <br />e es use o o properties. <br />Revised on August 18, 2010