My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-27_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-09-27_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:35 PM
Creation date
9/28/2010 9:57:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
9/27/2010
Doc Name
Email Regarding Reclamation Cost Estimate
From
Jim Stark
To
Mike Boulay; Sandy Brown
Type & Sequence
SL6
Email Name
JRS
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 092 State : Colorado Permit/job #: C-1981-041 <br />Date : 0912712010 County:Mesa Abbreviation :none <br />User: JRS Site : Roadside Portals Filename : C041-092 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase /1//// Bond Release SL-06 <br />Task description :Excavate Portal Area for New Drainage Channels <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 320C Horsepower : 138 <br />Weight (MT) : 19.70 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $26.97 NA Shift basis : 1 per day <br />Operating cost/hour : $36.07 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $101.76 Total fleet cost/hour : $101.76 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,590 CCY factor : 1.165 volume : 3,017 LCY <br />Source of estimated volume : Exhibits 6C and 26 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swino loaded. dump bucket. swina em <br /> Basic job condition description : BELOWAVERAGE <br /> Secondary job condition within basic description : SEVERE <br /> Cycle time value : a33 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.05 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 0.89 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,000 feet Altitude adjustment : 1.00 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 160.81 LCY/hour <br />Adjusted hourly unit production : 133.47 LCY/hour <br />Adjusted hourly fleet production : 133.47 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 22.61 hours <br />Unit cost : $0.762 per LCY Total job cost : $2,300
The URL can be used to link to this page
Your browser does not support the video tag.