My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-24_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2010-09-24_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:30 PM
Creation date
9/28/2010 9:56:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
9/24/2010
Doc Name
Adequacy Review Letter
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR54
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The proposed light-use road (not mentioned in the cover letter but <br />shown on Map 11) is depicted as an access road. Rule 2.05.3(3)(c)(vii) requires <br />that access roads by designed by, and certified following construction by a <br />registered professional engineer. Please clarify the classification of the proposed <br />new road based on the planned use as defined by Rule 1.04(111) and correct <br />and/or submit the required information. <br />5. If Mapl 1 title is to be changes from the currently approved Map 11, please <br />submit a new table of contents page for approved permit maps. <br />6. One water tank appears to have been added to Table 19 but two are <br />discussed in the cover letter. Please ensure that Table 19 clearly identifies each <br />water tank by size or volume. <br />7. The "central pumping station building" and the "rock dust pressure vessel" <br />described in the cover letter is not listed in Table 19. Please add this structure to <br />Table 19. <br />8. Please expand the permit narrative discussion of the "electrical power <br />distribution upgrade". Include substation changes or additions, power pole <br />locations or line locations with the number of poles added per line. If the power <br />company owns the poles and the poles will remain after reclamation, please <br />include a letter from the power company stating that the poles belong to them <br />and will remain when the site is reclaimed. <br />9. Please include cross-sections through the cut and fill area. If this cut <br />material is to be used for the Highway 12 alterations, describe how the area <br />proposed for disturbance will be returned to approximate original contour. Also <br />include maps and cross sections for this area in the reclamation plan portion of <br />the permit showing pre-mine and post-mine contours. <br />10. Map 11 is noted as "in transition" as updated survey control is added and <br />new structures are added. Please refer to Rule 2.10.1, in particular to the phrase <br />"legibly detail". Currently Map 11 includes information at a scale and or font that <br />cannot be discerned. Please refine this important map to provide legible detail of <br />all information being presented. <br />If you have questions, please call me. <br />$A, fGoEnvironmental Protection Specialist III
The URL can be used to link to this page
Your browser does not support the video tag.