My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_REVISION - C1981008 (10)
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-09-22_REVISION - C1981008 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:20 PM
Creation date
9/22/2010 5:01:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
9/22/2010
Doc Name
Response 5 Revised Section 2.05.4(2)(d)
From
Greg Lewicki & Associates
To
DRMS
Type & Sequence
PR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.0 Topsoil Replacement .......... ............................... 2.05.4(2)(d) -25 <br />11.1 Topsoil Replacement - 1988 and 1995 Study Areas .............. 2.05.4(2)(d) -25 <br />11.2 Topsoil Replacement - 1998/1999 Study Area .................. 2.05.4(2)(d) -27 <br />12.0 June 2010 Topsoil Balance, Sequence and Volumetrics ............... 2.05.4(2)(d) -27 <br />12.1 Prime Farmland Soils Balance, Sequence and Volumetrics ........ 2.05.4(2)(d) -27 <br />12.1.1 Morgan Property Prime Farmland ....................... 2.05.4(2)(d) -27 <br />12.1.2 WFC Prime Farmland ............................... 2.05.4(2)(d) -33 <br />12.2 Non -Prime Farmland Soils ... ............................... 2.05.4(2)(d) -36 <br />13.0 Topsoil Preparation Procedures Prior to Seeding .................... 2.05.4(2)(d) -40 <br />13.1 Irrigated Cropland (Prime farmland) Topsoil Preparation Procedures <br />................................ ............................... 2.05.4(2)(d) -40 <br />13.2 Reclaimed Irrigated Pastureland Topsoil Preparation Procedures ... 2.05.4(2)(d) -42 <br />13.3 Dryland Pasture Seedbed Topsoil Preparation Procedures ......... 2.05.4(2)(d) -43 <br />14.0 Topsoil Suitability Criteria and Testing Plan for Reclaimed Soils ......... 2.05.4(2)(d) -45 <br />15.0 Topsoil Remediation Plans ...... ............................... 2.05.4(2)(d) -46 <br />16.0 Resampling of Suitable Subsoil on Prime Farmland Soil Areas and Corresponding Results <br />................................ ............................... 2.05.4(2)(d) -47 <br />Tables <br />Table 2.05.4(2)(d) -1A Spoil and Soil Suitability Criteria (Morgan Prime Farmland) <br />............................................... .................2.05.4(2)(d) -5 <br />Table 2.05.4(2)(d) -1 B Spoil and Soil Suitability Criteria (Other Areas) ......... 2.05.4(2)(d) -7 <br />Table 2.05.4(2)(d) -2 Topsoil Stockpile Inventory (February 2008) ........... 2.05.4(2)(d) -15 <br />Table 2.05.4(2)(d) -2A Topsoil Stockpile Inventory (June 2010) .............. 2.05.4(2)(d) -18 <br />(Revised PR 06 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.